Sunday , May 16 2021

On Sunday, a road tunnel in Jihlava was closed – Visočina News



On Sunday, November 18, from 8 am to 2 pm, Jihlava tunnel services will close Jihlava services, which will be closed for inspection and possible repairs of technological facilities. It will be closed at the request of the Directorate for Roads and Highways of the Czech Republic, the Management Board of Jihlava.

"The control of the status of the control signaling control panel, SOS cabinets, signal passports, cable shafts in the tunnel, cleaning and sewer networks, structure of light frames, traffic light, ground and flow measurement were performed. portals, dilatations, crack lengths for remediation, coating, filling joints, curbs and assessment of drainage possibilities.
During the closure, the route will be guided in accordance with the tunnel operating code along roads II. class and local roads in Jihlava. The road will be approved by the respective authorities and will be compiled in accordance with the necessary documentation. The planned tour will take place at two roundabouts. The first route leads Pelhrim to Žižkov, U Cvičište, Hamernikova and Jiraskova streets.
The second route will take along D1 and then on the streets of Jiraskova, Hamernikova, U Cvičište and Žižkov.
Both directions will be correctly marked with a traffic sign that will be deployed on local SMJ communications.
We warn the driver to pay extra attention to the road. Due to the main complications in transport, D1 can still be repaired. Other short-term and unexpected closures or restrictions can also be expected on other paths, "said Martin Malek, spokesman
Services of the city of Jihlava, s.
The tunnel in Jihlava is free and has a length of 307 meters and started testing on July 1, 2004. Within one hour, the road will travel in both directions to about 6,000 passenger and freight vehicles leading to D1 or Znojmo and Vienna.


Source link